Wind measurement should be performed in one or some points in the area where the wind turbine will be established. In case an installation of high powers will be performed, wind measurement is absolutely required for a true and reliable investment.
Wind measurement should be performed at least for 1 year for the evaluation of all kinds of seasonal conditions. The measurement should be performed at least 30 heights.
The area on which the measurement pole will be constructed is examined and the most appropriate places, number, length of the measurement poles, the measurement tools to be used, communication and other requirements are determined.
In case the measurement poles will have GSM connection, it is searched whether the region is within the coverage of GSM or not.
|